6. Heating
1. Only heating and ventilation systems installed in accordance with the provisions of articles CH 1 to CH 43 (§ 1.1 to § 7.3.3 of [TBA 3 005]) are permitted.
2. Electric generation-emission units installed in accordance with articles CH 44 and CH 45 (§ 8.1 and § 8.2 of
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Bibliography
Also in our database
-
Euroclasses – Classements européens en réaction au feu. - [TBA 211] (2013).
...
Regulations
Order R. 111-15 of the French Construction and Housing Code concerning provisions applicable to floors other than the first floor of residential buildings.
Article R. 123-3 of the French Construction and Housing Code – Amended by Decree no. 2009-1119 of September 16, 2009 concerning the obligations of builders, owners and operators of establishments open to the public.
Article R. 3511-6 of the French Public Health Code...
Standards and norms
- Protection des structures contre la foudre - NF C 17-100 - 12-97
- Practical guide – Lightning protection – Part 2: Risk assessment - UTE C17-100-2 - 01-05
- Fire safety systems (SSI) – Safety power supplies (AES) - NF S 61-940 - 06-00
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!