6. Water drainage
The purpose of a drainage system, which must be included in the design of the structure, is to ensure :
rapid drainage of rainwater to prevent flooding of the roadway;
protection of the structure from water infiltration, with varying levels of harmful agents.
The rainwater drainage system is essentially made up of gargoyles placed every 20 m or so on either side of the roadway or railway platform (figure 18). They collect surface water from a roadway, which is usually roof-shaped (for a two-way roadway) with two 2.5% slopes, or with a single slope (for a one-way or two-way roadway) of the same value. Water can be evacuated without special precautions in open country, but in urban areas it is evacuated by means of gutters...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Water drainage