2. Method of construction and excavation
The proposed layout of the tunnel and shafts takes the following factors into account:
geological checks and soil homogeneity ;
the type of terrain encountered, which defines the type of machine to be used;
the type of material to be used for the work;
determining the pickling system;
types of injections to be performed ;
possible distances between wells ;
checking high and low water levels;
-
environmental constraints, which are :
utility and concession works already located underground,
surface traffic (pedestrians and vehicles),
industrial and commercial activities around the construction site,
consultation with political leaders and associations,
administrative authorizations,
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Method of construction and excavation
Bibliography
-
Objectifs et moyens des études de sol pour les projets de microtunnels - . Mai 1994. Cahier technique LCPC, INSA de Lyon, BRGM, SADE, TERRASOL, GDF, BONNA, GEOMEGA, ETERNIT, EUDIL, CNRS.
-
État de l'art et recommandations pour le dimensionnement des tuyaux pour le microtunnelage - . Septembre 1994. Cahier...
Organizations
AFTES Association française des travaux en Souterrains
FSTT Comité français des travaux sans tranchées
Suppliers (non-exhaustive list)
Akkerman http://akkerman.com
Decon Soltau USA http://[email protected]
Herrenknecht http://[email protected]
Iseki http://[email protected]
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!