2. Tunnel construction methods
Tunnel construction can be summed up in three stages:
digging up the soil: this is the felling function;
evacuate excavated soil: this is the marinating function;
support the ground if it is not naturally stable: this is the function of support (temporary) and/or lining (permanent).
Ever since the first underground structures were built, the principle has been to excavate over a limited length so that the structure remains stable in the short term, i.e. for the time it takes to set up any retaining structures: this is sequential work, which means that the various functions have to be carried out one after the other, and which requires relatively large-scale human intervention...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Tunnel construction methods
Bibliography
-
(1) - ANAGNOSTOU (G.), KOVÁRI (K.) - The face stability of slurry-shield-driven tunnels. - Tunnelling and Underground Space Technology (1994).
-
(2) - ANAGNOSTOU (G.), KOVÁRI (K.) - Face stability in slurry and EPB shield tunneling. - Geotechnical aspects of underground construction in soft ground, Mair et Taylor (1996).
...
Also in our database
-
BOURGEOIS (E.), SÉBASTIEN (B.), CUIRA (F.) - Modélisations numérique des ouvrages géotechniques, -
Standards and norms
CCTG fascicule 69 "Travaux en souterrains" of 20/01/2012 (approved by the decree of May 30, 2012) and its application guide (25/10/2019)
https://www.economie.gouv.fr/daj/fascicule69-cctg-mp-travaux-genie-civil-travaux-en-souterrain
AFTES: The Association Française des Travaux...
Directory
Organizations – Federations – Associations (non-exhaustive list)
AFTES: French Tunnel and Underground Space Association
http://www.aftes.asso.fr/
CETU: Center for Tunnel Studies
http://www.cetu.developpement-durable.gouv.fr/
ITA / AITES:...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!