2. Shooting plan design
Designing a blast plan involves defining the drilling geometry, mine loading and initiation dates. Basically, it consists of ensuring :
the normal operation of the charges to provide them with a suitable free surface and clearance volume: this involves controlling the operation of the blast, mine by mine: this principle is governed by so-called efficiency rules. The processes of fragmentation (propagation of shockwaves and gases) and rock displacement (swelling of the massif) must have time to take place;
correct product operation, avoiding problems of explosive desensitization (inability to initiate);
the...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Shooting plan design
Regulations
Main regulations in force on January 1 1990 governing the acquisition, transport, storage and use of industrial explosives.
General application texts
1. Law n° 79-519 of July 2, 1979 punishing failure to declare the disappearance of explosive products (JO of July 2 and 3, 1979).
2. Decree no. 80-1022 of December 15, 1980 implementing the above law (JO of December 20, 1980).
3. Decree no. 79-846...
Manufacturers. Suppliers (non-exhaustive list)
Davey Bickford Smith & Co.
Explo-Tech (Company)
Exsia
Nitro Bickford (Sté)
Nitrochimie (Sté)
Nobel Explosif France (Sté)
Orica
Group. Association
GFEE Groupe Français de l'Énergie Explosive
AFTES Association Française des Travaux en Souterrain
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!