4. Implementation and maintenance
The installation report is an important part of any testing assignment. This report must present all the instruments installed, their position, the procedure for installing the instrumentation and the entire measurement chain. Data sheets describing the characteristics of each instrument must be appended to this document, including their calibration curves. The installation report must also give the equation used to pass from the transmitted signal to the physical measurement, and must give the initial or "zero" values of each measuring instrument. The report must show the connection diagram between the sensors and the acquisition unit.
Finally, any problems encountered during the installation of instrumentation that could have consequences for the monitoring of...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Implementation and maintenance
Bibliography
-
(1) - ALLAGNAT (D.) - La méthode observationnelle pour le dimensionnement interactif des ouvrages. - Presses de l'École Nationale des Ponts et Chaussées (2005).
-
(2) - TERZAGHI (K.) - Theoretical soil mechanics. - New York, Wiley Publications (1943).
-
(3) - AFTES - Tunnels...
Also in our database
-
REIFFSTECK (P.) - Stabilité des pentes. Glissements en terrain meuble. - [C 254]...
Regulations
NF P94-156 (October 1995) Sols : reconnaissance et essais – Inclinometer measurements.
Decree no. 2007-1735 of December 11, 2007 on the safety of hydraulic structures. Journal officiel of December 13, 2007. http://www.legifrance.gouv.fr
Arrêté du 29 février 2008 fixant des prescriptions relatives à la sécurité et à la sûreté des ouvrages hydrauliques....