5. Pile justification
In Austria, where the energy pile technique seems to be widely used, geothermal structures do not appear to be subject to any particular checks. In France, a position similar to that of Austria could have been adopted. Nevertheless, as a first step, it seemed reasonable to develop justification principles compatible with the calculation standards in application (Eurocode 7 and standard NF P 94-262) based on the knowledge acquired to date in various research programs and in particular the ANR GECKO Project carried out between 2011 and 2014.
A geothermal pile is not a pile with a different technology from other piles. Any pile can be geothermal: bored pile, hollow auger pile, driven pile, etc. As temperature seems to have little effect on soil strength properties...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Pile justification
Bibliography
-
(1) - FRODL (S.), FRANZIUS (J.N.), BARTL (T.) - Design and construction of the tunnel geothermal system in Jenbach. - Geomechanics and Tunnelling, 3(5): 658-668 (2010).
-
(2) - ADAM (D.), MARKIEWICZ (R.) - Energy from earth-coupled structures, foundations, tunnels and sewers. - Géotechnique, 59(3): 229-236 (2009).
- ...
Also in our database
-
BOUGEOIS (E.), BURLON (S.), CUIRA (F.) - Modélisation numérique des ouvrages géotechniques, -
Standards and norms
- Justification of geotechnical structures – Eurocode 7 national application standards – Deep foundations. NF P 94-262, AFNOR, 208 p. - AFNOR - 2012
- Fundamentals. American Society of Heating Refrigeration and Air – Conditioning Engineers, Inc., Atlanta, USA. - ASHRAE - 2009
- modifié par le décret n° 2015-15 du 8 janvier 2015 portant sur la géothermie minime importance. - Décret n° 78-498 - du 28 mars 1978
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!