4. Numerical example
A multi-storey building. The floors consist of composite slabs on joists. The aim is to verify the ultimate and service limit states of this composite slab. The calculation of the ribbed sheet at the construction stage is not considered in this example.
The composite slab rests on five beams spaced 2.5 m apart. The length of one plate is 10 m, representing four 2.5 m spans. The plate is not supported at the construction stage. The static diagram of the composite slab is shown in figure
.
The following choices are made (with the corresponding product characteristics), based on pre-sizing and analysis at the construction stage, not reproduced in this example:...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Numerical example