4. Procedure for carrying out the work
The A150 freeway construction site was located on the SE edge of the town of Yvetot and some ten km north of the city of Rouen. It provided the link between the A150 freeway and the A29 freeway. The location map (figure
18
) also shows the main restorations carried out with the Scorgrave.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Procedure for carrying out the work
Bibliography
Technical guides
-
GTR -
. – Guide technique SETRA/LCPC : 2e édition : réalisation des remblais et des couches de forme (Juillet 2000).
-
GTS -
Traitement des sols à la chaux et/ou aux liants hydrauliques. Application à la réalisation...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!