2. Method of construction and excavation
The proposed layout of the tunnel and shafts takes the following factors into account:
geological checks and soil homogeneity ;
the type of terrain encountered, which defines the type of machine to be used;
the type of material to be used for the work;
determining the pickling system;
types of injections to be performed ;
possible distances between wells ;
checking high and low water levels;
-
environmental constraints, which are :
utility and concession works already located underground,
surface traffic (pedestrians and vehicles),
industrial and commercial activities around the construction site,
consultation with political leaders and associations,
administrative authorizations,
...