3. Demolition using French methods
SCROLL TO TOP
3.1.1 Full powdering (often mistakenly called implosion)
In the French "foudroyage intégral à la française" method, the building is collapsed in on itself using a burst of rapid fire, after significant mechanical lightening of the blasted levels in horizontal bands (mechanical demolition of staircases, partitions and part of the load-bearing walls), leaving only the trumeaux pillars to be mined.
The process is as follows:
— the choice of dividing...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Demolition using French methods