4. ERTMS equipment production
Deployment of the ERTMS Niv2 system requires ground-side installation of RBCs interfaced with :
On the mobile side, EVC equipment is also interfaced with the specific environment required for its operation (HMI, tachometer, radar, power supply, isolation switch, emergency brake controls, etc.).
Each rail infrastructure, and each rail operator, deploys the ERTMS system in its own area (trackside or onboard), according to its own criteria, in compliance with the SRS 2.3.0 standard.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
ERTMS equipment production