2. When do you need to draw up a hazard analysis?
The hazard study must be carried out in one of the following cases:
preparation of an application for authorization to operate (DDAE) for a new plant;
completion of a DDAE as part of an administrative regularization or modification of operating conditions involving a significant change in relation to authorized operating conditions, deemed significant by the prefect;
projects for the creation of an installation or structure for which a special intervention plan must be drawn up (in application of article 15 of loi n° 2004-811 du 13 août 2004 de modernisation de la sécurité civile ) and which require an authorization or approval decision;
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
When do you need to draw up a hazard analysis?
Bibliography
Also in our database
-
(1) - Constituer son dossier d'autorisation sous le régime Seveso - [FIC...
Regulations
Arrêté ministériel du 29 septembre 2005 ( known as PCIG ) relative à l'évaluation et à la prise en compte de la probabilité d'occurrence, de la cinétique, de l'intensité des effets et de la gravité des conséquences...
Website
www.prim.net This site brings together information on natural and technological hazards to build individual and collective resilience.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!