7. Mistakes to avoid
Checking the level of risk present in your facilities "as is", according to the products, processes and equipment as well as the configuration of the workplaces, and then subsequently integrating the safety barriers, makes it possible to :
a better understanding of the intrinsic risks of its site;
facilitate the choice of priorities for action on the changes to be made to reduce these risks;
justify and verify the effectiveness and usefulness of existing or future safety barriers;
be in a position to choose the most appropriate actions for your site, particularly in economic terms.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Mistakes to avoid
Bibliography
Also in our database
-
(1) - Organiser le résumé non technique de l'étude de dangers - [FIC...
Bibliography
Guide méthodologique national du 25 juin 2003 , based on the INERIS model, version 1, dated May 20, 2003 " Outils d'analyse des risques générés par une installation industrielle ".
Circular dated 10/05/10 summarizing the methodological rules applicable to hazard studies, risk reduction at source and technological risk prevention plans (PPRT) for classified facilities, in application of the law...
Regulations
-
Code de l’environnement
comprising a Legislative section, a Regulatory section and an Appendices section, which includes the ICPE nomenclature (in particular Article R. 512-33 of the Environment Code, which specifies the cases in which a hazard study must be carried...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!