3. Feedback
A bank "A" merged with a bank "B", and these two banks created a third group, an EIG "C". The request was to set up a continuity plan within this EIG "C".
SCROLL TO TOP
3.1.1 Definition and objectives
A project management team has been set up, with the primary aim of producing a BCP to guarantee the provision of an agreed level of service in the event of a major incident, and to enable better consideration of major risks in the face of IS vulnerabilities. One...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Bibliography
-
(1) - WOOD (D.), HOLLNAGEL (E.) -
Resilience Engineering : Concepts and Precepts.
-
Hampshire, England : Ashgate (2006).
-
(2) - HOLLNAGEL (E.) -
Resilience Engineering in practice, a guidebook.
-
Ashgate...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!