3. Feedback
A bank "A" merged with a bank "B", and these two banks created a third group, an EIG "C". The request was to set up a continuity plan within this EIG "C".
SCROLL TO TOP
3.1.1 Definition and objectives
A project management team has been set up, with the primary aim of producing a BCP to guarantee the provision of an agreed level of service in the event of a major incident, and to enable better consideration of major risks in the face of IS vulnerabilities. One of the main objectives of...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Bibliography
-
(1) - WOOD (D.), HOLLNAGEL (E.) - Resilience Engineering : Concepts and Precepts. - Hampshire, England : Ashgate (2006).
-
(2) - HOLLNAGEL (E.) - Resilience Engineering in practice, a guidebook. - Ashgate (2009).
Also in our...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!