6. Application of DUERP
The aim of this section is to illustrate the concept of DUERP and its operational implementation through case studies.
In company B, the DUERP is based on the methodological elements described in figure
2
and is based on :
A rating of the frequency of occupational risks: each risk is assessed on a scale ranging from "very rare" (1 to 3 times a year) to "daily" (daily or even several times a day);
A grading of the seriousness of each risk according to four levels ranging from "not very serious" (superficial lesions without work stoppage) to...