2. Process for taking risk levels into account in the design phase
Integrated prevention involves applying safe design principles to future work equipment as early as possible
and ISO 6385. It sets designers the objective of obtaining the lowest possible level of residual risk, given the state of the art (figure
3
). This...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Process for taking risk levels into account in the design phase
Bibliography
-
(1) - NEUMANN (W.P.), WINKELHAUS (S.), GROSSE (E.H.), GLOCK (C.H.) -
Industry 4.0 and the human factor (2020) A systems framework and analysis methodology for successful development,
-
International Journal of Production Economics, Elsevier, online nov. 2020,
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!