Constructive fire prevention measures
Fire safety in buildings receiving the public

Add to my library

C3280 V4 Article

Constructive fire prevention measures
Fire safety in buildings receiving the public

Author : Cabinet CASSO et Cie

Review date: February 9, 2015 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Constructive fire prevention measures

4.1 Separation from other buildings

All buildings must be isolated from neighbouring structures:

  • or by a clear distance, measured horizontally, of at least 8 m in width ;

  • or by CF° 1 h or 2 h walls (or more in the case of certain hazardous, industrial or storage operations, 3 h for stores, showrooms, libraries, not fully protected by a sprinkler system, § ).

When activities are superimposed in the same building, isolation is achieved at the level of CF° separating floors and stairwells, which must be constructed using walls and doors with the required degrees of fire resistance. For facades, the C + D rule must be respected (§ )....

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Safety and risk management"

( 477 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us