2. General structure of the MOSAR method
The method is built around two visions, hence the two modules that make it up (figure
2
):
a macroscopic vision, leading to module A, which consists in carrying out an analysis of proximity risks, or main safety analysis. It is because the elements that make up the installation (storage, machines, production lines, operators) are in close proximity to one another that risks appear, often major ones. These elements are modeled as systems, which enables us to identify how...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
General structure of the MOSAR method