6. Glossary
Covid-19; Coronavirus disease
Disease that appeared in 2019 caused by the severe acute respiratory syndrome type 2 coronavirus.
Risk factor
Characteristic associated with an increased or decreased risk of a health problem.
Stress; stress
Imbalance between a person's perception of the constraints imposed on them by their environment and their perception of their own resources for coping with them.
Syndrome du bâtiment malsain; sick building syndrome
Combination of symptoms associated with the use of a building.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Bibliography
Bibliography
-
(1) - PROJECT MANAGEMENT INSTITUTE - Guide du corpus des connaissances en management de projet (guide PMBOK). - 6e édition (2017).
-
(2) - DAB (W.) - Santé et travail. - Arnaud Franel (2020).
-
(3) - CROZIER (M.) - L'acteur et le système. - Points (2014).
...
Also in our database
-
DAB (W.), FURTADO (T.), COUSIN RENIÉ (M.-A.), GODON (A.-S.) - Grands enjeux de santé dans les entreprises. - [SE 3 800]...
Standards and norms
- Lignes directrices sur le management de projet - ISO 21500:2012 - 2012
Regulations
Decree no. 2001-1016 of November 5, 2001 creating a document relating to the assessment of risks to workers' health and safety.
Websites
French National Institute for Research and Safety (INRS) http://www.inrs.fr
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!