3. Bearing at the head of the installation
When a wastewater treatment plant is built, designers are most often obliged to install a lift station, for the following reasons in particular:
-
site topography :
-
hydraulic constraints :
when ERU are transported over long distances with variations in elevation, gravity flow may be insufficient,
lift stations regulate flows by temporarily accumulating ERU and then pumping it out at a constant rate;
sewer network configuration: in a complex urban wastewater system, several networks may converge on a single lift station before conveying the water to the STERU.
cost optimization: sometimes it is more economical to install a...