1. Project design
In France, flood prevention and agricultural policy have led to the physical modification of watercourses through intensive recalibration and rectification work. Consultation of the Bergerac archives has shown that "old bottoms, old banks" dredging of "non-floatable, non-navigable" rivers has been common practice in the Lot and Dordogne departments since at least the early 19th century. More recently, a comprehensive dredging of the Céou in Lot was undertaken around 1946
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Project design
Bibliography
-
(1) - TELEOS : DEGIORGI (F.), GRANDMOTTET (J.P.) -
Potentialités piscicoles et degré d'altération physique du Céou ainsi que des principaux affluents et émissaires karstiques.
-
Étude réalisée pour EPIDOR dans le cadre de la mise en place du contrat de rivière Céou (2000).
-
(2)...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!