3. Processes
From an operational point of view, start-up corresponds to the time required to bring the reactor up to its nominal load with a process efficiency in line with the desired specifications. The aim is to increase the applied volumetric load (AVL, defined according to equation (3) in table 9) as quickly as possible, without inhibiting the ecosystem.
Upgrading is generally implemented according to a conventional strategy, which consists of gradually increasing the organic matter input at each feed cycle, while maintaining optimum methanogenic activity. In this way, the feed rate is increased in stages according to the digester's...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Processes
Bibliography
-
(1) - ADEME (2011) - Qualité agronomique et -sanitaire des digestats. - Rapport final, octobre 2011.
-
(2) - ADEME (2013) - Estimation des gisements potentiels de substrats utilisables en méthanisation. - Rapport final, avril 2013.
-
(3)...
Also in our database
-
BAYARD (R.), GOURDON (R.) - Traitement biologique des déchets. - [G2060],...
Events
Expo Biogaz, the national exhibition for the biogas industry: http://www.expo-biogaz.com/
Biogaz Europe, the European exhibition : http://www.biogaz-europe.com/
Regulations
Loi n° 2010-788 du 12 juillet 2010 portant engagement national pour l'environnement (version consolidée au 06 février 2017) JO du 13/07/2010 : JORFTEXT000022470434.
Standards
- Soil improvers and growing media – Determination of organic matter and ash - AFNOR. NF EN 13039 - Décembre 2011
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
Ametyst methanization unit http://www.montpellier3m.fr/equipement/unit%C3%A9-de-m%C3%A9thanisation-am%C3%A9tyst
Clottes Biogaz methanization unit
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!