5. Mistakes to avoid
Tests in pilot plants are essential to validate process parameters, particularly temperature profiles. A failed line test can compromise the very credibility of your development. Don't hesitate to ask your suppliers to help you set up the lines; they have the know-how linked to the transformation stage. Successful pilot tests will significantly increase your chances of deployment on industrial lines, and guarantee your credibility.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Mistakes to avoid
Bibliography
Also in our database
-
(1) - Les préalables à la rédaction d'un accord de confidentialité - [FIC...
Acronyms and abbreviations
PBAT: PolyButylene (Adipate-co-Terephthalate)
PBS: PolyButyleneSuccinate
PE: Polyethylene
PET: PolyEthyleneTerephthalate
PHAs: PolyHydroxyAlcanoates
PHB: PolyHydroxyButyrate
PHBV: PolyHydroxy (Butyrate-co-Valerate)
PLA: PolyLactic Acid
PDLA: Poly-D-Lactic Acid
PP: PolyPropylene
Glossary
kDa
Kilo Dalton ~ kilo gram/moles
Master batch
Concentrate in granulated form containing active ingredients to achieve specific desired performance benefits, either in the manufacture of products or in the finished products themselves.
Meltstrengthenhancer
Additives to increase the viscosity and toughness of plastics in the molten state.
MFI ( Melt flow index )
A method commonly used in...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!