3. Resource forecasting in MS Project 2007 and 2010
Before you start assigning resources, you need to enter all the information you've gathered about the resources, their origin (internal or external, the groups and work packages concerned) and their cost. This will save you time and improve quality when allocating project resources. Versions of MS Project 2007 and 2010 offer allocation and control modes for labor and material resources, as well as a task inspector to optimize audit functions.
Work resources can be allocated in two different ways: by the load distributed uniformly over the entire duration of the work, or on a variable daily basis, without altering the resource's overall work schedule. Equipment resources and material resources are subject to specific allocation criteria,...