2. Process for taking risk levels into account in the design phase
Integrated prevention involves applying safe design principles to future work equipment as early as possible and ISO 6385. It sets designers the objective of obtaining the lowest possible level of residual risk, given the state of the art (figure 3). This approach is based on two processes: risk assessment...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Process for taking risk levels into account in the design phase