5. Limits and pitfalls of logistics sizing
First of all, it's not possible to predict everything in a system
that's not yet up and running. If we assume that the land and the
building have not yet been found, some of the assumptions initially
made may turn out to be far removed from future reality.
Sizing is based on long-term forecasts of activity by flow. If
trends are not subsequently confirmed to the extent that the choice
of structuring elements is called into question, the study has to
be repeated, with more constraints than initially envisaged.
Assumptions are crucial to the success of the study, and each
of them must be validated by an expert: trade, equipment supplier,
automation, etc., or measured if the system or activity exists, or
estimated using methods such as SMB2. Assumptions may turn out to
be correct for one type of equipment and wrong for others.
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Limits and pitfalls of logistics sizing