3. RCM2™ method developed by John Moubray
As indicated in section
1
, the selection of proactive maintenance tasks qualified as technically feasible and worth doing in RCM2 is conditioned by the use of two major steps: the performance of a specific FMEA study and...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
RCM2™ method developed by John Moubray
Bibliography
-
(1) - NOWLAN (S.), HEAP (H.) - Reliability-Centered Maintenance. - United States Department of Defense (1978).
-
(2) - MOUBRAY (J.) - RCMII, Reliability-Centered. - Second edition 2.2 Maintenance Industrial Press Inc. (1997).
- ...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!