5. Organization of heavy work
Level 4 or 5 jobs (§
1.4
), such as major overhauls of complete units, require special organization. Task networks are often used. The job is broken down into elementary tasks of known duration, and a chronological relationship is established between the tasks. These are then arranged in a network where the earliest and latest times are shown for each task, thus determining a critical path, or sequence of operations...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Organization of heavy work
Bibliography
-
(1) - BOUCLY (F.) - Le management de la maintenance assistée par ordinateur (MMAO). - Afnor (1990).
-
(2) - - Guides d'entretien SEMT Pielstick, moteur PC 4.2 (1998).
-
(3) - - Guide d'entretien MAN, moteurs K98 MC, S50 MC.C (2003) L28/32H...
Also in our database
-
ARNOUX (H.) - Pièces de rechange en maintenance. - [MT 9 320] (2004).
- ...
Directory
Manufacturers, constructors
This non-exhaustive list essentially includes the engine and machine manufacturers mentioned in the article.
MAK http://www.mak-global.com
MAN AG http://www.man.de
SEMT Pielstick http://www.pielstick.com
...
Standards and norms
- Industrial maintenance – Maintenance function - FD X60-000 - 04-16
- Maintenance – Key performance indicators for maintenance - NF EN 15341 - 06-07
- Maintenance – Maintenance terminology - NF EN 13306 - 10-10
- Maintenance – Maintenance documents - NF EN 13460 - 10-09
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!