5. Current network and projects
The French waterway network (cf. ) is divided into basins, with no real continuity between them. With the exception of the Seine-Nord/Pas-de-Calais link, they are linked by 250-t Freycinet-gauge canals.
The table 5 sets out the main features.
SCROLL TO TOP
Connecting the wide-gauge network is a priority, as it will fundamentally transform the river economy. It is characterized by a juxtaposition of disconnected sub-markets. Opening up the major links...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Current network and projects