2. Application of the structured and shared drawing method to five projects
Five project examples are presented below: four successes and one failure.
SCROLL TO TOP
2.1.1 Background to the resumption of a shutdown project
Construction of a twenty-kilometre urban freeway was interrupted in the middle of the worksite in the city of V. The purpose of the contract is to take over the worksite as it stands and complete it rapidly. The contracts of some of the original players have been retained and reactivated, with the...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Application of the structured and shared drawing method to five projects
Bibliography
-
(1) - AUTISSIER (D.), MOUTOT (J.-M.), BENSEBAA (F.) -
Les stratégies de changement.
-
Dunod (2012).
-
(2) - MADERS (H.-P.), CLET (É.) -
Comment manager un projet.
-
Cinquième tirage, Eyrolles (2009)....
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!