4. Failures, postponements, growing uncertainties, for what reasons?
While aerial cable may look interesting on paper, actual implementation is rare and, as we've just seen, sometimes takes a long time. This is due to a number of factors, which we'll attempt to review below. First and foremost, the "urbanization" of cableways is a question of their integration into the landscape, even more so than overflight issues, which are sometimes raised, or their relevance to an already extensive choice of transport modes. While a cable routed through a heterogeneous area already marked by transport infrastructure or high-voltage lines (as in the case of Câble 1 in the Paris region) may go relatively unnoticed (although it has not been acclaimed locally), its insertion into more homogeneous urbanized areas with a higher proportion of housing may prove more problematic. Last but not least, financing issues may play a role, if the gains initially announced are encumbered by additional...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Failures, postponements, growing uncertainties, for what reasons?
Bibliography
-
(1) - SCHNEIDER (Y.), CLEMENT-WERNY (C.) - Transport par câble aérien en milieu urbain. - CERTU, Collection Références, n° 125 (2012).
-
(2) - MAZAUD (J.-R.) - Trams du ciel. Atlas mondial des téléphériques et autres transports à câble urbains. - Paris, La Découverte (2017).
- ...
Standards and norms
STRMTG, Remontées mécaniques RM1; Exploitation, modification et maintenance des téléphériques, version 4 of December 22, 2017.
Regulations
Arrêté du 23 mai 2003 relatif aux dossiers de sécurité des systèmes de transport guidés public urbains, JORF n° 132 du 8 juin 2003 NOR : EQUT0300808A.
Arrêté du 7 août 2009 relatif à la conception, à la réalisation, à la modification, à l'exploitation et à la maintenance des téléphériques, JORF n° 2016 du 18 septembre 2009 NOR : DEVT0916606A.
Ordonnance n° 2015-1495 du 18 novembre 2015 créant une section spécifique au...
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
Bartholet Maschinenbau AG
https://www.bartholet.swiss/en
Doppelmayr Seilbahnen GmbH – Garaventa
https://www.doppelmayr.com/fr/
Leitner
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!