2. RAD and prototyping
To achieve its objectives, this method proposes a specific iterative development cycle (figure
2
).
Requirements are defined with users during JRP (Joint Requirement Planning) meetings, at the end of which (and even during which) the conceptual data model is built. JAD (Joint Application Design) meetings are then organized. These define the detailed specifications. The application is then built using the prototyping method.
A RAD project therefore comprises the following stages:
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
RAD and prototyping