When a pipeline is constructed, sections measuring between 12 m
and 18 m in length are welded together. Figure 6 shows a welded joint
following surface preparation. At the cut-backs, protection needs
to be restored that is equivalent to the factory-applied coating,
but under site conditions, which can sometimes be sub-optimal (poor
weather, temperature, workspace). The application of coatings perpendicular
to welded joints is thus a sensitive operation, requiring rigorous
product selection and mastery of the application methods.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Paints & Varnishes – Corrosion protection of steel structures
by protective paint systems - ISO 12944-5 - 2018
Preparation
of steel substrates before application of paints and related products
– Visual assessment of surface cleanliness – Part 1: Rust grades and
preparation grades of uncoated steel substrates and of steel substrates
after overall removal of previous coating - ISO 8501-1 - 2007
Petroleum...
Regulations
Articles L. 555-1 to L. 555-30 of the French Environmental Code
Articles R. 555-1 to R. 555-52 of the French Environmental Code
GESIP technical guides
Decree of 5 March 2014 defining arrangements for the application
of Chapter V of Part V of Book V of the Environmental Code including
regulations on the safety of pipelines for the transport of natural
or similar gas, hydrocarbons and chemicals.