2. Installation and start-up
Machine builders and suppliers make a number of engineers and technicians available on site for equipment assembly and start-up.
Foundry engineering also involves determining the number and qualifications of in-house personnel needed to operate and maintain the new facilities.
To ensure optimum commissioning of the new installations, this staff will need to be trained. This will, of course, facilitate and accelerate start-up. This training will be linked to :
For example, it is particularly desirable to involve maintenance personnel in the assembly of sub-assemblies (mechanics),...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Installation and start-up
Bibliography
-
ROUSIERE (D.) - Projet ingénierie de fonderie Iran Kodro Casting Industry - Doc. JD Braun (2005).
-
LAVALETTE (G.) - Choix des investissements en fonderie - Fonderie Fondeur d'Aujourd'hui N° 218, page 50 (Octobre 2002).
-
JOLIVOT (R.) - Le bilan énergétique des...
Also in our database
-
FOURET (J.L.) - Ingénierie des fonderies - [M 854] (1995).
-
CUENIN (P.) - La fonderie française - Données économiques, [M 3 505] (2010).
-
CUENIN...
Standards and norms
Table 1 – Foundry waste nomenclature
- Déchets provenant de procédés thermiques. - 10 -
- Déchets de fonderie de métaux ferreux. - 10 09 -
- Laitiers de four de fonderie. - 10 09 03 -
- Noyaux et moules de fonderie n'ayant pas subi la coulée contenant des substances dangereuses. - 10 09 05* -
- Noyaux et moules de fonderie n'ayant pas subi la coulée autres que ceux visés à la rubrique 10 09 05....
Directories
-
Merger
ABB
Inductothermie
Junker (Germany)
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!