2. Current situation
-
The success of the 1.5 Mt/year industrial plant at Pohang [7] provides a clearer picture of the performance of the FINEX [7] process, confirming the results of the demonstration unit described above.
They can be summarized according to three criteria:
-
Production
This unit has already produced cast iron at a rate of 4,200 t/day, close to the target nominal value of 4,300 t/day.
-
Energy consumption
We're already at 780 kg/t of cast iron, including 207 kg injected into the nozzles, and we hope to get down to 750 kg/t of cast iron.
-
Casting qualities
We're at 0.026% sulfur, and 0.62% silicon (which we hope to lower below 0.5%).
...