4. Evolving context
The demand for frequency control, and the resources available to provide it, depend on technological developments, changes in the European energy landscape and current legislation. This section provides an overview of current developments.
The need for frequency control depends essentially on the characteristics of the power system and the TSO's practices.
SCROLL TO TOP
4.1.1 Changes in energy policy
The rapid development of new means of production based on fatal primary energies (wind and photovoltaic)...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Evolving context
Bibliography
-
(1) - UCTE - Operation Handbook, P1-Policy 1 : Load-frequency control and performance [C]. - Union for the Co-ordination of Transmission of Electricity (UCTE), Bruxelles, Belgique, mars 2009, disponible : http://www.entsoe.eu
-
(2) - UCTE - Operation Handbook,...
Also in our database
-
BORNARD (P.), PAVARD (M.), TESTUD (G.) - Réseaux d'interconnexion et de transport : réglages et stabilité. -
Events
CIGRE (once every 3 years) http://www.cigre.org
IEEE Power and Energy Society General Meeting (annual) http://www.ieee.org
JEEE Powertech (once every 2 years) http://www.powertech.com
SEE evening lectures (once every 2...
Regulations
Law no. 2000-108 of February 10, 2000 on the modernization and development of the public electricity service.
Decree no. 2008-386 of April 23, 2008 on general technical requirements for the design and operation of production facilities connected to public electricity networks.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!