5. Control (instrumentation, start-up, operating safety)
The control system ensures a constant turbine shaft speed and a given power output. These two parameters are dependent on each other, since the
2.2
compressor characteristic associates an air flow mair with the speed of rotation and, according to equation
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Control (instrumentation, start-up, operating safety)
References
In Engineering Techniques
-
(1) - GIRAUD (M.), SILET (J.) - Turbines à gaz aéronautiques et terrestres. - B 4 410 Machines hydrauliques et thermiques, nov. 1992.
-
(2) - LORANCHET (Y.) - Mise en œuvre des turbines à gaz dans l'industrie. -
Standardization
- Gas turbine – Acceptance tests - ISO 2314 - 1989
- - ISO 2314 - 1989/Cor 1 : 1997
- pour des installations de puissance à cycle combiné - ISO 2314 - 1989/Amd 1 : 1997
- Gas turbines – Acquisition specifications – Part 1: General introductions and definitions - ISO 3977-1 - 1997
- Gas turbines – Acquisition specifications – Part 2: Normal reference conditions and characteristics - ISO 3977-2 - 1997
...
Databases
ORAP based on EPRI (Electric Power Research Institute http://www.epri.com managed by SPS (Strategic Power System. Inc) http://www.spsinc.com
NERC North American Electric Rehability Concil http://www.nerc.com
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!