1. General principles for master plans
Drawing up master plans is a relatively major task, but one that is necessary to obtain a realistic vision of the development of MV distribution facilities (source substations and MV networks). It is structured by the various stages listed below:
inventory of existing MV facilities (source substations and MV networks) ;
consumption and power forecasts, possibly including power injected by decentralized generation ;
establishment of the long-term target for source substations and MV networks (note that the construction principles ultimately lead to a single target, see §
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
General principles for master plans