2. Anticipation of networks to accommodate renewable energies via S3REnRs
Regional grid connection schemes for renewable energies (S3REnR) were introduced by the "Grenelle 2" law and implemented by its implementing decree of April 20, 2012.
Drawn up by the network operators and validated by the regional prefect, they reflect the regional climate, air and energy plans (SRCAE), which set targets for the development of renewable energies (RE) in each administrative region.
The S3REnR is an effective tool for optimizing and anticipating the network upgrades needed to accommodate renewable energies, by offering them reserved capacity over the long term (10 years from publication of the plan) and visibility on the costs and timescales of these network upgrades.
Indeed, the creation of HV links, as well as the creation or reinforcement of source substations, are necessary to accommodate all the renewable energy expected in a given region. However, to avoid...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Anticipation of networks to accommodate renewable energies via S3REnRs
Bibliography
-
(1) - KARSENTI (L.), LEJAY-BRUN (E.), MALARANGE (G.), WITKOWSKI (J.) - Field demonstration of local voltage regulation on Enedis MV Network, - CIRED, paper 0494 (2013).
-
(2) - BEAUNÉ (F.), MINAUD (A.), PAGNETTI (A.), PELTON (G.), KARSENTI (L.) - Voltage Regulation on DG Connected to MV Network Technical...
Regulations
Code de l'Énergie, decree and order of 23/04/08, decree of 28/08/07, decree of 20/04/12, order of 02/07/14, deliberations of the Commission de régulation de l'énergie (CRE) on smart electricity grids (REI) of 12/06/14 and 08/12/16.
Patents
Enedis patents on local and coordinated voltage regulation processes
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!