2. Performance and yield verification
Standard practice is to check that the equipment supplied delivers the contractually agreed performance.
The manufacturer generally has a certain amount of time (1 to 2 months) to fine-tune his equipment and carry out adjustments, after which acceptance tests are carried out.
These tests cover at least :
achieving maximum speed;
-
obtaining :
of boiler outlet pressure,
superheated and reheated steam temperatures in the pages provided,
good combustion quality,
guaranteed performance (at one or more speeds) ;
and, more generally, on the verification of contractual stipulations, which can vary widely depending on the purpose for which the equipment is used by the customer. These include pressure losses (superheater, resuperheater), steam purity, limitation...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Performance and yield verification
Bibliography
Generous works
-
Aide-mémoire du thermicien A3 E2Th. - Éd. Européennes Thermique et Industrie (1987).
-
IDEL'CIK (I.E.) - Mémento des pertes de charge. - Éd. Eyrolles (Paris).
-
FALTIN (H.) - Technische Wärmelehre. - Acad....
Standardization
Association Française de Normalisation AFNOR
http://www.boutique.afnor.fr
- Code de construction des générateurs de vapeur. 272 p. comprend 8 parties de E 32-101 à E 32-120, dont E 32-103 : calcul de résistance des éléments soumis à une pression intérieure. - NF E 32-100 - 1-90
Deutsches Institut für Normung DIN
Manufacturers. Manufacturers (non-exhaustive list)
The Syndicat National de la Chaudronnerie, de la Tôlerie et de la Tuyauterie Industrielle (SNCT) can provide a list of its members on request. http://www.snct.org/
However, we should mention
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!