4. Sizing dry process furnaces
The proposed calculation method is a two-stage process:
first, an initial assessment of the furnace diameter is made, based on the desired production (P
1
), using the law of material transport inside a rotating, inclined tube ;
in a second step, reconciling the heat exchange capacity and the energy requirements for clinkerization enables a second evaluation of the kiln output (P
2
); this evaluation is based on the diameter estimated above, taking an arbitrary kiln length of 16.4 D
i
, of which 12 D
i
...
You do not have access to this resource.