The creation of the UP3 (chain A) and UP2 800 processing-recycling
plants was authorized by decree on May 12, 1981. The main fuel processing
and waste conditioning workshops (figure
1
) were commissioned at regular intervals
between 1986 for the first fuel storage pools and 2001 for the final
R4 plutonium processing workshop at UP2-800. With a total of around
34,000 tonnes of fuel from pressurized water reactors...