3. Conclusion
The EPR is the best possible choice for keeping the nuclear option open by 2020, in line with France's energy policy, and thus being in a position to renew France's nuclear power plants. In continuity with the plants currently in operation in France and Germany, the EPR nevertheless offers innovative features that combine long experience with compliance with safety authority requirements.
The decision by TVO, the Finnish operator of the Olkiluoto 1 and 2 power plants, to build an EPR following an international call for tenders demonstrates the soundness of the choices made. The EPR is now a benchmark for the construction of new third-generation nuclear power plants.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Conclusion
Bibliography
Reference
-
(1) - ICRP Publication 63 : Principles for intervention for protection of the public in a radiological emergency - . Annals of the ICRP, 22/4 (1993).
EPR documents
-
EPR - . AREVA (2005).
-
Le...
Regulations
Council Regulation (EEC) No. 737/90 of March 22, 1990, on the conditions governing imports of agricultural products originating in third countries following the accident at the Chernobyl nuclear power station.
Technical guidelines for the design and construction of the next generation of pressurized water reactors, October 2000.
Letter DGSNR SD2 n° 0729/2004 of September 28, 2004 "Safety options for the EPR reactor project".
...
Organizations
French Nuclear Safety Authority (ASN) http://www.asn.fr/
French Atomic Energy Commission (CEA) http://www.cea.fr/
International Commission on Radiological Protection (ICRP) http://www.icrp.org/
Forschungszentrum Karlsruhe...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!