1. Role and presentation of a control system
Like any continuous industrial process, a nuclear power plant or spent fuel reprocessing plant requires the implementation of means to monitor and control the physical process taking place there.
Together, these resources form the control architecture (figure 1):
physical parameters are measured by instrumentation;
process control and monitoring by operators via a man-machine interface (control devices, indicators, recorders, display screens, etc.) located in a control room;
PLCs process the signals supplied by the instrumentation and the orders given by operators to control and monitor the process. These PLCs carry out operations on binary data (on-off...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Role and presentation of a control system
Bibliography
References
-
(1) - - Commission Électrotechnique Internationale − Norme de la CEI − Publication 880 : « Logiciels pour les calculateurs utilisés dans les systèmes de sûreté des centrales nucléaires », première édition 1986 ; Bureau central de la CEI, Suisse.
-
(2) - - RCCE − Règles...
Manufacturers and suppliers
Non-exhaustive list
Sema Group (Division Energie)
Schneider Electrichttp://www.schneider-electric.fr
Cegelechttp://www.cegelec.fr
Organizations and laboratories
LCIEhttp://www.lcie.fr
Sopemeahttp://www.sopemea.fr
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!