5. Glossary
BEC; Bare Erected Cost
Capital expenditure on equipment, storage and general services.
BOP; Balance Of Plant
Equipment other than that present in the main installation and interfaces.
CAPEX; CAPital EXpenditure
Process capital expenditure, including the cost of equipment and installation, and all process environmental costs.
EPC; Engineering, Procurement & Construction
Type of contract including design, purchasing and construction; this corresponds to the TOC plus the contractor's margins.
OPEX; OPerational EXpenditure
Process operating expenses, including material (e.g. assets) and energy (e.g. utilities) consumption, fixed costs (e.g. labor, taxes and insurance) and variable costs (e.g. waste management, emission taxes).
TOC; Total Overnight Cost
Capital expenditure for the process, including the cost of the equipment...