2. Site preparation
When a new building site is awarded, the construction company appoints a site manager to be in charge of its construction. This may be (depending on the size of the site) :
-
For small sites, there is no permanent on-site supervision.
Most construction sites are organized in an intermediate way between these two solutions.
For the construction of a hospital, for example, dozens of supervisory...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Site preparation
Bibliography
-
GRANGE (C.) - La Loi MOP (Maîtrise d'ouvrages publics) - Un ouvrage qui permet de comprendre et d'appliquer sereinement la loi MOP. Editions Le Moniteur (2007).
-
RABATEL (M.), ESTINGOY (P.) - Prévenir les risques d'une opération de construction - Collection Méthodes, Éditions Le Moniteur (2006).
- ...
Also in our database
-
LEFEBVRE (J.-P.) - Organisation de chantiers des travaux publics - [C112v2] Construction (2009).
Software tools
AUTOCAD http://www.autodesk.fr
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
HAULOTTE GROUP Equipment for lifting people and loads (aerial work platforms, scissor lifts, telescopic forklifts...)
http://www.haulotte.com
ORU France Concrete batching plant
http://www.orufrance.fr/
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!