2. Determining needs
To optimize the design of the electrical infrastructure for a construction site, it is essential to work with the future site manager or the head of the Methods department to study the projected needs of the project. This is a kind of audit, covering the points examined below.
SCROLL TO TOP
2.1.1 Receiver census
Drawing up a list of receivers (lighting, motors, heating, low-current receivers) is not usually a problem. However, it is important not to omit power supplies for low-current equipment,...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Determining needs
Websites
Energy suppliers http://www.energie-info.fr
Organisme professionnel de prévention du bâtiment et des travaux publics (OPPBTP) (Professional organization for building and public works prevention) http://www.oppbtp.com/
Standards and norms
- Postes de livraison alimentés par un réseau de distribution publique HTA (jusqu'à 33 kV) - NF C13-100 - 04-15
- High-voltage electrical installations – Supplementary rules for production sites and industrial, tertiary and agricultural installations (classification index: C13-200) - NF C13-200 - 09-09
- Low-voltage electrical installations – Title 7: Rules for special installations and locations, updated June...
Regulations
Guide UTE C 15-401 – January 2004 – Low-voltage electrical installations – Practical guide – Generators – Installation rules
Decree no. 88-1056 of November 14, 1988 implementing the provisions of the book II of the French Labour Code (title III Hygiene, safety and working conditions) concerning the protection of workers in establishments where electrical currents are used.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!