6. Glossary
Mast mooring
Connection system between the mast and the structure to be served, ensuring its stability and absorbing mechanical stress.
Lifting device
Device for moving a load or a person at height. It is a piece of work equipment.
Fitness for purpose
Ability of new equipment to perform its functions safely before being put into service for the first time in the European Union. Fitness for use is the responsibility of the manufacturer.
Base frame or base chassis
The lowest section of the unit on which the other components are mounted and supported.
Certificate of Professional Competence (CCP)
Issued by SFECE to its members to certify their technical capabilities.
Maximum working load (WLL)
Maximum load a component is authorized to support, as designated by the manufacturer.
Rated load (RL)
Maximum load of people...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Bibliography
-
(1) - CNAMTS, INRS, OPPBTP - Socle commun de prévention – Sécurité et protection de la santé sur les chantiers. - (2013).
-
(2) - INRS - Approche économique de la prévention sur une opération de construction. - ED 6186 (2014).
-
(3) - INRS - Vérifications...
Also in our database
-
SERIN (P.) - Plateformes élévatrices mobiles de personnes. - [TBA 626]...
Regulations
Arrêté du 1er mars 2004 relatif aux vérifications des appareils et accessoires de levage, JO du 31 mars 2004.
Arrêté du 2 mars 2004 relatif au carnet de maintenance des appareils de levage, JO du 31 mars 2004.
Directive 2006/42/EC of the European Parliament and of the Council of May 17, 2006 on machinery, and amending Directive 95/16/EC (recast), OJEU June 9, 2006 (the "Machinery Directive").
French Labor...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!