2. Layout of heat production equipment
SCROLL TO TOP
2.1.1 Equipment installed in the boiler room
Any appliance or group of appliances producing heat and/or cold by combustion, as referred to in section 7.2.7.5, with a total output of more than 70 kW, must be installed in a boiler room that complies with the requirements of title 1and of the decree referred to in section
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Layout of heat production equipment
Also in our database
-
PAUCHET (W.) - Sécurité incendie des ERP – Références glossaire et documentations, -
Standards
- Refrigeration systems and heat pumps – Safety and environmental requirements – Part 4: Operation, maintenance, repair and recovery (Classification index: E35-404-4) - NF EN 378-4 - Avril 2017
- Flue pipes – Thermal-air calculation methods – Part 1: flues serving a single appliance (classification index: P51-002-1) - NF EN 13384-1 - Mai 2015
- DTU 24.1 – Building work – Smoke-proofing work – Cahier des charges [cancelled...
Other regulations
Arrêté du 23 juin 1978 relatif aux installations fixes destinées au chauffage et à l'alimentation en eau chaude sanitaire des bâtiments d'habitation, de bureaux ou recevant du public (ERP) (Decree of June 23, 1978 on fixed heating and hot water installations in residential, office and public-access buildings)
Arrêté du 21 mars 1968 modifié fixe les règles techniques de sécurité applicables au stockage et à l'utilisation...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!